appliances kitchen cooking ,china wholesale Gas Stove Spare Parts and burners ,camper stainless steel sink with 2 Gas stove double burner gas stove,two burner gas stove,gas stove 2 burner table gas stove ,flip gas stove double burner gas stove,two burner gas stove,gas stove 2 burner table gas stove ,flip gas stove Guangdong Puda Electrical Appliance Co., Ltd. , https://www.pokaeleca.com
NINGBO ZHENHAI BOLANG METAL PRODUCT FACTORY was established in 2001.  BOLANG centres high precision CNC machining as our core competence, the company specializes in producing auto parts, agriculture parts, machinery parts, lighting parts, hardware fittings etc. We can provide pressure casting, sand casting, investment casting, gravity casting, the material covers aluminum alloy such as A380, A390, ADC12,YL102, A356, aluminum extrusion of 6000 series, zinc alloy, iron, copper etc.
The products are mainly exported to countries such as USA, Europe (England, Germany, Italy, Belgium etc), Asia (Japan,Korea etc). And the company has successfully passed ISO/TS16949 quality management certificate.
Â
Material:
 ADC-12
Cavity Number:
1
Process Technology:
High pressure die casting
Product Dimensions:Â
Customized
Casting General Tolerance:
Grade GB-CT4
Surface Finish:Â
Polishing, Vibratory deburring,Anodizing, Power Coating, Painting,etc
Flow Processes:Â
Die casting, Trimming, Polishing, vibratory deburring, Machining, Cleaning,Packing, Shipping
Control Measure:
Incoming Material Test, First Article inspection, Routing inspection, Final item inspection, and Outgoing quality control
Inspection Equipment:Â
CMM, Caliper, Plug Gage,Spectrograph,Pneumatic measuring tool,etc
Application:
 LED Lighting Accessories
 Furniture AccessoriesÂ
 Electronic & Electric AccessoriesÂ
 Auto & Motorcycle Accessories
 Machinery AccessoriesÂ
 Public FacilitiesÂ
Â
Certificate:
ISO/TS16949:2009
Lead Time
30-35 days
Trade Term:
FOB Ningbo
FAQ Q1. When can I get the price? A:  We usually quote within 2-3 days after we receive the RFQ or feedback within 2 days if any questions on prints need to be confirmed. Q2. How long is the lead-time for mold? A: Usually it depends on the size and complexity of the mold. But normally, the lead time is 35-45days. Q3. I have no 3D drawing, how should I start the new project? A:  You can supply us a sample, we will help work on establishing 3D model accordingly. Q4. Before shipment, how to ensure the products quality? A: We have strict development procedure, during samples development, we have capacity to produce according to PPA, after PSW approved,
Â
NINGBO ZHENHAI BOLANG METAL PRODUCT FACTORY was established in 2001.  BOLANG centres high precision CNC machining as our core competence, the company specializes in producing auto parts, agriculture parts, machinery parts, lighting parts, hardware fittings etc. We can provide pressure casting, sand casting, investment casting, gravity casting, the material covers aluminum alloy such as A380, A390, ADC12,YL102, A356, aluminum extrusion of 6000 series, zinc alloy, iron, copper etc.
The products are mainly exported to countries such as USA, Europe (England, Germany, Italy, Belgium etc), Asia (Japan,Korea etc). And the company has successfully passed ISO/TS16949 quality management certificate.
Â
Material:
 ADC-12
Cavity Number:
1
Process Technology:
High pressure die casting
Product Dimensions:Â
Customized
Casting General Tolerance:
Grade GB-CT4
Surface Finish:Â
Polishing, Vibratory deburring,Anodizing, Power Coating, Painting,etc
Flow Processes:Â
Die casting, Trimming, Polishing, vibratory deburring, Machining, Cleaning,Packing, Shipping
Control Measure:
Incoming Material Test, First Article inspection, Routing inspection, Final item inspection, and Outgoing quality control
Inspection Equipment:Â
CMM, Caliper, Plug Gage,Spectrograph,Pneumatic measuring tool,etc
Application:
 LED Lighting Accessories
 Furniture AccessoriesÂ
 Electronic & Electric AccessoriesÂ
 Auto & Motorcycle Accessories
 Machinery AccessoriesÂ
 Public FacilitiesÂ
Â
Certificate:
ISO/TS16949:2009
Lead Time
30-35 days
Trade Term:
FOB Ningbo
FAQ Q1. When can I get the price? A:  We usually quote within 2-3 days after we receive the RFQ or feedback within 2 days if any questions on prints need to be confirmed. Q2. How long is the lead-time for mold? A: Usually it depends on the size and complexity of the mold. But normally, the lead time is 35-45days. Q3. I have no 3D drawing, how should I start the new project? A:  You can supply us a sample, we will help work on establishing 3D model accordingly. Q4. Before shipment, how to ensure the products quality? A: We have strict development procedure, during samples development, we have capacity to produce according to PPA, after PSW approved,
Â
Customized Die Casting Mold or Die Casting Mould Manufacturer
Model NO.: bl031
Pressure Chamber Structure: Vertical
Tolerance Grade: 6
Casting Surface Quality Level: 2
Certification: ISO 9001:2008
Delivery: 30 Days
Mould Leadtime: 35 Days
Shaping Mode: Die Casting
Cetificate: ISO9001 / Ts16949
Brand Name: Hanway or OEM
Trademark: Customized
Transport Package: Pallet
Specification: Customized
Origin: China
HS Code: 7616991090
Model NO.: bl031
Pressure Chamber Structure: Vertical
Tolerance Grade: 6
Casting Surface Quality Level: 2
Certification: ISO 9001:2008
Delivery: 30 Days
Mould Leadtime: 35 Days
Shaping Mode: Die Casting
Cetificate: ISO9001 / Ts16949
Brand Name: Hanway or OEM
Trademark: Customized
Transport Package: Pallet
Specification: Customized
Origin: China
HS Code: 7616991090